Projects

'}}

Vessel Scrubber and Surge Tank for WFT-WIRA Barges


ID PROJECT:

12HO-026ME

CUSTOMER:

PT. Wira Insani (Weatherford International)

PROJECT TITLE:
Vessel Scrubber and Surge Tank for WFT-WIRA Barges
TYPE:

Pressure Vessel, Skid & Piping

EQUIPMENT NAME:

Flare Gas Scrubber, V-401/ V-701, Closed Drain Vessel, V-501/ V-801, Surge Tank, V-201

SCOPE OF WORK:

Design & Supply

WEIGHT KGS:

14.507

YEAR BUILT:

2013

CODE/STD:

ASME VIII Div.1

Specification Summary

  • Two (2) units Vent Gas/ Closed Drain Vessel, V-501 & V-801, 1219 ID x 3048 T/T
  • Two (2) units Flare Gas Scrubber, V-401-W1 & V-401-W2, 1676 ID x 3048 T/T
  • One (1) unit 100 BBL Dual Compartment Surge Tank, 2438 ID x 3048 T/T
  • Material Specification Plain carbon steel SA516 Gr. 70 and NACE MR 0175

Code Compliance

  • ASME VIII Div. 1 – ASME BPV Code Rules for Construction of Pressure Vessels
  • ASME B31.3 – Process Piping
  • AWS D1.1 – Structural Welding Code Steel

We did

  • Engineering works, such-as Mechanical Calculations, Construction Drawings, Structural Skid Drawings and Isometric Drawings
  • Fabrication, testing & inspection, coating of Pressure Vessels, Structural Skids & Pipings
  • Volumetric Calibration of Surge Tank
  • MIGAS Certifications and Lloyd's Register
  • Delivery at site

Safety summary

  • Total 25682 working hours
  • Lost time injury – 0
  • Day lost incident – 0
  • Near misses reported – 0

For any project inquiries, feel free to contact us

OUR SERVICES

How do we help your project

Additional capabilities have been added to the organization to include technical assistance and support, installation, maintenance of products and design of systems.

Engineering Services

Study to Revamp

Cleaning Services

Performance Assessment

Maintenance Services

©2023 pt-htsi.com. All Rights Reserved.