Crude Oil Cooler HE-1551 for Early Production Facility EPF-3 Plant Expansion, Banyu Urip, Cepu, Mobil Cepu Ltd

Specification Summary

  • 5.06 MMBtu/hr for cooling of 12571 BOPD Crude Oil from 217F to 145F
  • Forced draft, ASME U-Stamp & National Board
  • Moore Fans Class 10000 S30 VE Manual HD EC RH diameter 8 FT 6 blades
  • WEG NEMA Motor Type 0940M, 20 hp (15kW)/ 3 phase/ 380VAC/ 4 pole/ 1460 rpm/ 50 hz, NEMA Design B, Insulation Class F, Class 1 Div. 1, TEFC, SF1.15, 284T Frame V6R(D)
  • The Unit Cooler is equipped with MCC F2100 series Eaton Cutle Hammer 20hp with VFD 9000X AF Drive Series Model SVX020A1-4A1B1, Vibration Switch Murphy VS2-EX

 

Code Compliance

  • ASME VIII Div. 1 – ASME BPV Code Rules for Construction of Pressure Vessels
  • API Std 661 – Air-Cooled Heat Exchangers for General Refinery Service
  • NACE MR0175 – Standard Material Requirements Sulfide Stress Cracking Resistant Metallic Materials for Oilfield Equipment
  • AWS D1.1 – Structural Welding Code Steel

 

We did

  • Engineering works, such-as Thermal Design, Mechanical Design, Structural Skid Analysis, Fan Rating & Drive Selection, 3-D Modeling, Construction Drawings, Electrical &
  • Instrument Drawing
  • Fabrication, testing & inspection, coating of header box, bundle and support structural
  • Installation of motors, belt drives and fans, including belt alignment
  • Installation of Electrical & Instrument
  • Assembly & Install MCC F2100 series Eaton Cutler Hammer 20 HP
  • Performance test at shop & site


Print